03.2 / Geothermal
In geothermal work, depth and mast load are read together.
High depth is where the 1500–3000 m trailer class and the 2500 m special build are used.
⚡ Fifty geothermal wells in Central Anatolia and the Aegean, 1200–2600 m depth range, successfully drilled and cased.